Pwalugu Hydroelectric Power Station
Yi palo
| Pwalugu Hydroelectric Power Station | |
|---|---|
| Country | Ghana |
| Location | Pwalugu, Talensi District, Upper East Region |
| Coordinates | 10°36′02″N 00°19′50″W / 10.60056°N 0.33056°WCoordinates: 10°36′02″N 00°19′50″W / 10.60056°N 0.33056°W |
| Purpose | Power |
| Status | Under construction |
| Construction began | June 2020 |
| Opening date | January 2024 (Expected) |
| Owner(s) | Government of Ghana |
| Operator(s) | Volta River Authority |
| Dam and spillways | |
| Type of dam | Reservoir |
| Impounds | White Volta |
| Height | 165 metres (541 ft) |
| Reservoir | |
| Surface area | 350 square kilometres (140 sq mi) |
| Turbines | 2 x 30MW |
| Installed capacity | 60 megawatts (80,000 hp) |
Pwalugu Hydroelectric Power Station nyɛla 60 megawatts (80,000 hp) kom niɣilim buɣim du sheli bɛ ni na mɛra Gana puuni. Di yi naai, tahama bɛni ni di zaŋli tuɣi 50 megawatts (67,000 hp) Kurugu Solar Power Station ka di laɣim lɛbi 110 megawatts (150,000 hp) Pwalugu-Kurugu Hydro-Solar Hybrid Power Plant, dina n nyɛ tuuli lala tatabo Gana puuni.[1]
Luɣili
[mali niŋ | mali mi di yibu sheena n-niŋ]Lala niɣilim buɣim duu ŋɔ, din yaɣi White Volta, nyɛla din miri Pwalugu, n bɛ Talensi District, Upper East Region puuni, kaman 142 kilometres (88 mi), Tamali northeast yaɣali, Ghana, Northern Region tiŋ zuɣu din'nyɛ tiŊ titali. Di bɛla kaman 765 kilometres (475 mi), Accra north east yaɣili, din nyɛ Ghana tiŋ zuɣu.
Kundivihira
[mali niŋ | mali mi di yibu sheena n-niŋ]- ↑ Jean Marie Takouleu (3 March 2020). Ghana: Construction of the Pwalugu multipurpose dam will start in April 2020. Afrik21.africa.